Mayfair
New single level basement construction (top down). Secant piling around building perimeter with load bearing piles to support GF slab, RC works, below ground drainage, steel frame/ staircase and conflor decking to superstructure.
-
Fitzrovia
New two storey basement and steel superstructure. Demolition works to core, underpinned and secant piled basement, RC works, below ground drainage and steel/ conflor frame.
-
Chelsea
New single level basement construction (top down). Demolition of internal core, load bearing/ contig piles, underpinning to perimeter, RC works, below ground drainage and steel frame.
-
Hackney
New single basement construction (bottom up). Demoltion of two existing houses. Underpinning to party walls and contiguous piled retaining walls. RC works, below ground drainage and Steel, timber and conflor superstructure.
-
Paddington
Lowering of an exisiting basement (underpinning 1000mm deep) RC works and below ground drainage. New Steel Frame and roof structure.
-
Richmond
New single level basement structure (Bottom up). Demolition of existing rear extension. Underpinning to support rear elevation and perimeter RC retaining walls. RC works and below ground drainage. Steel Frame to superstructure.
-
South Kensington
New single level basement construction (bottom up). Underpinning to party walls. RC retaining wall installed in an underpinning seqeunce to front and rear. RC works, below ground drainage and Steel, timber and conflor superstructure.
-
Clerkenwell
New single level basement construction (top down). Contig piling to form internal basement structure. Load bearing piles to support new 6 storey internal Steel and Conflor Frame. Comprised of RC works, below ground drainage, steel frame/ Steel and concrete staircases, conflor decking to superstructure.
-
Holland Park
Cut and Carve of existing home. New internal Steel frame with timber and conflor. RC works, below ground drainage.
-
Holland Park
New basement and swimming pool construction (top down). Underpinning to party and rear retaining walls. Load bearing/ contig piles, RC works, below ground drainage and steel frame to superstructure.
-
Westminister
Cut and Carve of existing commercial space. New internal Steel frame. RC works, underpinning, piling, below ground drainage, RC Column strengthening. 8 storey commercial adaption.
-
Kensington
New single level basement construction (top down). Secant piling around building perimeter with load bearing piles to support GF slab, RC works, below ground drainage, steel frame and conflor decking to superstructure.